THE SCRUM FRAMEWORK - PART 3


This is in continuation with The Scrum Framework Part 2. Please read Part 2 before proceeding with this post. This is the last post in the series THE SCRUM FRAMEWORK. So let us begin with the last part of the series.

SPRINT REVIEW 


A Sprint Review is held at the end of the Sprint to inspect the Increment and adapt the Product Backlog if needed. During the Sprint Review, the Scrum Team and stakeholders collaborate about what was done in the Sprint. Based on that and any changes to the Product Backlog during the Sprint, attendees collaborate on the next things that could be done to optimize value. This is an informal meeting, not a status meeting, and the presentation of the Increment is intended to